GOVERNMENT OF MANIPUR|
MTDC Manipur Tribal Development Corporation Limited Emblem
MTDC LIMITEDMANIPUR TRIBAL DEVELOPMENTCORPORATION
—FIELD DOCUMENTATION

MTDC Media & Field Documentation Archive

Documenting field progress, infrastructure handovers, community interactions, and press notifications across all hill districts of Manipur.

—VISUAL ARCHIVE

Field Documentation Gallery

All-weather Hill Road Construction & Slope Stabilization
Geo-tag: 25.26° N, 94.01° E
Senapati District
18 Sep, 2026

All-weather Hill Road Construction & Slope Stabilization

Reinforced concrete retaining wall and asphalt blacktopping on arterial hill highway connecting remote habitations.

Women SHG Handloom & Craft Training Facility
Geo-tag: 24.98° N, 93.92° E
Kangpokpi District
14 Sep, 2026

Women SHG Handloom & Craft Training Facility

Women artisans operating fly-shuttle frame looms in the naturally ventilated tribal craft training hall.

Gravity-feed Village Water Reservoir System
Geo-tag: 24.32° N, 94.01° E
Chandel District
09 Sep, 2026

Gravity-feed Village Water Reservoir System

High-ridge spring catchment treatment plant and dual storage tanks providing continuous clean drinking water.

Community Resource Centre & Digital Library
Geo-tag: 24.33° N, 93.68° E
Churachandpur District
02 Sep, 2026

Community Resource Centre & Digital Library

Solar-powered multi-purpose civic building completed and handed over to the local community development committee.

Integrated Livelihood Post-Harvest Complex
Geo-tag: 24.98° N, 93.49° E
Tamenglong District
26 Aug, 2026

Integrated Livelihood Post-Harvest Complex

Farmers Producer Organization grading, packing, and cold-store facility for organic mountain produce.

Administrative Headquarters & Operational Wing
Lamphelpat-795004
Imphal West
15 Aug, 2026

Administrative Headquarters & Operational Wing

Main administrative office and engineering planning directorate of Manipur Tribal Development Corporation Limited.

OFFICIAL COMMUNICATIONS

Press Releases & Media Statements

Official press notes, public briefings, and media declarations published by MTDC.

MTDC Concludes Annual District Review Meeting for HADP Hill Schemes (2026–27)

18 Sep, 2026•PDF • 680 KB
Download

Sanction of 14 New Village Gravity Water Supply Works in Chandel and Tengnoupal

11 Sep, 2026•PDF • 520 KB
Download

Empanelment of Quality Audit Engineering Consultants for Hill District Infrastructure

03 Sep, 2026•PDF • 1.1 MB
Download